Marine Construction Projects

Name: LO-1 SurfaceWater Contrl Structure
Owner: City of Palm Coast - Mike Brennan (386) 986-4721
Started: Dec-14
Completed: Feb-15
Amount: $383,325.00
Description of Project: Construction of Water Control Structure consisting of demolition, redesign and rebuilding of the existing structure, stabilization of banks.
Name: Riverfront Improvements Phase II
Owner: City of Palatka - Jonathan Griffith (386) 329-0100
Started: Jun-14
Completed: Nov-14
Amount: $1,156,343.55
Description of Project: Improvements to Riverfront including new parking lot. Retention pond excavation. New floating docks, and shoreline protection using coquina rip rap.
Name: Astor Marina Restaurant
Owner: Port of Call Yacht Club, LLC - Hugh Upton (386) 334-5200
Started: Jul-14
Completed: Aug-14
Amount: $96,818.00
Description of Project: Helical underpinning of foundation. Jacket and epoxy seal timber piling, replaced beams and equalized load, leveled floor, Shoreline Stabilization with riprap bags. Install retaining wall to hold back foundations soils.
Name: LCWA Hickory Point Dock Improvements
Owner: Lake County Water Authority - Michael Perry (352) 343-3777
Started: May-14
Completed: Jul-14
Amount: $114,925.00
Description of Project: Rebuilding of 6 Alum. fixed piers, and installing of 6 gangways. Floating docks. ADA kayak launches.
Name: Tidelands Condominums Rip Rap
Owner:  Tidelands Condo. Association - Paul Hyde (904) 687-1794
Started: Mar-14
Completed: Jun-14
Amount: $184,500.25
Description of Project: Clearing. Grading. Armoring of 1,900 LF of Shoreline Utilizing Coquina.
Name: M-3 Surface Water Control Structure
Owner:  City of Palm Coast - Mike Brennan (386) 986-4721
Started: Feb-14
Completed: May-14
Amount: $439,325.00
Description of Project: Construction of Water Control Structure consisting of demolition. Redesign and rebuilding of the existing structure. Stabilization of banks.
Name: Gateway Promenade Improvements
Owner:  City of Flagler Beach - Robert Smith (386) 517-2000
Started: Nov-13
Completed: Apr-14
Amount: $534,173.69
Description of Project: 995' Elevated Timber Boardwalk. Timber Handrail and Covered Pavilion. Overlook Along A1A.